The water line is dug. It snowed, we froze. My brother destroyed two hickory handles on a a pickax and a 20 pound sledge. Ultimately, we may have lost some tools but we got through the rock shelve and the dirt. We will now have water for the house and for the fields. in total it took three days with 2-3 people working but we made it over 500 feet from the road to the house.
The water line is dug. It snowed, we froze. My brother destroyed two hickory handles on a a pickax and a 20 pound sledge. Ultimately, we may have lost some tools but we got through the rock shelve and the dirt. We will now have water for the house and for the fields. in total it took three days with 2-3 people working but we made it over 500 feet from the road to the house.
No comments:
Post a Comment