Tuesday, January 15, 2013

tiny house: water

The water line is dug. It snowed, we froze. My brother destroyed two hickory handles on a a pickax and a 20 pound sledge. Ultimately, we may have lost some tools but we got through the rock shelve and the dirt. We will now have water for the house and for the fields. in total it took three days with 2-3 people working but we made it over 500 feet from the road to the house. 


The water line is dug. It snowed, we froze. My brother destroyed two hickory handles on a a pickax and a 20 pound sledge. Ultimately, we may have lost some tools but we got through the rock shelve and the dirt. We will now have water for the house and for the fields. in total it took three days with 2-3 people working but we made it over 500 feet from the road to the house.

Wednesday, January 9, 2013

tiny house: shower

So, The photo is fairly dark but here is a little peak at the concrete shower pan. It is in place and ready to start on the side panels. I am back at work as of this week and thus the internet access should yield some posting. More to come on water lines, chimney building, siding, countertops, sink, and more.