This is a retrospective photo. Here I am laying out the house site. We drover rebar into the ground at key points so as to allow us to visualize the size and shape of the house. This picture was taken mid July. We began foundation work shortly after this picture was taken.
The house foundation now sits to about where I am kneeling. You can see the thick forrest in the background and the field to the South. We have since thinned the forest and trimmed the undergrowth to about seven foot. This Winter we will plant hazelnuts in the protection of that pine forest.
To the left you can see some of the foundation work in progress. We gathered mountain stone from near the house site and placed large rocks in a trench. Some of the rocks were excessively large , we laid these in the corners. in addition to the mountain rock we also took gravel from the old logging trail and filled the foundation with crushed stone in fill.
Following the rock and gravel we poured 4 inches of concrete base layer all around the perimeter. once this was set and cured we poured an additional cap of concrete over and around the first layer. The layering created a wide, firm and well established foundation on which we laid mortar and one corse of eight inch block.
Here is another shot of me working on the forms for the base layer of concrete. The photo shows the East side and the North side of the surrounding area. The East side drops off into the lower meadow and wetland and the North gives way to more dense woods. We cleared 3/4 of the East trees in order to create a healthy managed forest enviroment. We kept the maples, sassafras, a few interesting pine trees and sweet gums. The thinned forest will allow these trees to thrive and become stronger well established specimens. It also allows for more light in the house and a better view.