Sunday, August 26, 2012

Third Rib


The third rib is up, square and level. We have begun "mocking up" the future porch by laying a beam out to a pier. It is shaping up as planned and we will be ready for the second story soon. 

It is nice to see the lumber pile migrating into use as portions of the house. We are most of the way through the pile and will be in need of another run to the lumber mill soon. Considering the lumber mill is 4.8 miles away this should not be too much of a time suck. 

The sub floor is in in the bathroom as well as in part of the main house. We have left a access door into the crawl space so as to allow under house adventures and plumbing/ electric work as needed or when. It was nice to stand up on the future second floor and look down. It was also nice to catch a glimpse of what the view will be from the bedroom. 
The above photo shows our shameless use of lag bolts to hold the timber frame together. We did use angle bracing ( cherry in this case) to help keep the frame in square. While mortis and tenon would have been beautiful and is an honorable craft. It is not a craft I possess and so in the interest of stability the lag screws are countersunk into the frames, hidden but there. 



No comments:

Post a Comment