Floor completed. The downstairs is now adorned with beautiful maple flooring. It looks so nice I might get sick when I cut the holes in it for the sink drain. Now that the floor is complete both upstairs and down we are ready to rent a floor sander and get the whole place feeling slip-n-slide smooth. We plan to apply a light coat of Brie Wax to the floor thought the color has yet to be selected. We want to maintain the lightness of the maple but also want something carmely rich.
Showing posts with label flooring. Show all posts
Showing posts with label flooring. Show all posts
Tuesday, October 23, 2012
Saturday, October 6, 2012
update October week one
So, we have been busy at work. Actually busy at work. We have not had the time to put toward the tiny timber house that we would have liked. The start of October has seen a slowing in the construction of the house. Though thanks to a friend for letting us borrow a floor stapler the wood flooring is almost done.
Yesterday we framed the shower walls. We help to do a concrete shower with a little help from of friends at Set in Stone. We are also almost ready to template out countertops. We plan to do the countertops in concrete as well, also with some help from Set in Stone. The bathroom wall, our only interior wall, is framed.
We bought a bathroom sink this week. This brings our secured amenity total to: bathroom sink, shower head, kitchen sink, propane cooktop, and propane hot water heater. We chose cast iron sinks for both of our sinks and the hot water heater is an outdoor model that we are retrofitting to supply the house. More on that concept to follow, when we install.
This week is Fall break at the school I work at. Meaning, we will have additional time to work on the house. Yesterday we framed a door on the second floor and that takes us one step closer to being fully dried in. By the end of this upcoming week we will be. We are then ready for our radiant barrier insulation. Check out the stuff we use at our friends blog: tiny revolution.
Yesterday was a big day. We framed a door, built piers for the front porch. Laid timbers level on the piers and nailed in deck joists. We also took care of framing the entire bathroom/ shower.
This is the update for now. I will try to get some photos soon.
tinyrevolution.us/http://tinyrevolution.us/2012/10/05/special-radiant-barrier-and-insulation-offer-from-ecofoil/
Yesterday we framed the shower walls. We help to do a concrete shower with a little help from of friends at Set in Stone. We are also almost ready to template out countertops. We plan to do the countertops in concrete as well, also with some help from Set in Stone. The bathroom wall, our only interior wall, is framed.
We bought a bathroom sink this week. This brings our secured amenity total to: bathroom sink, shower head, kitchen sink, propane cooktop, and propane hot water heater. We chose cast iron sinks for both of our sinks and the hot water heater is an outdoor model that we are retrofitting to supply the house. More on that concept to follow, when we install.
This week is Fall break at the school I work at. Meaning, we will have additional time to work on the house. Yesterday we framed a door on the second floor and that takes us one step closer to being fully dried in. By the end of this upcoming week we will be. We are then ready for our radiant barrier insulation. Check out the stuff we use at our friends blog: tiny revolution.
Yesterday was a big day. We framed a door, built piers for the front porch. Laid timbers level on the piers and nailed in deck joists. We also took care of framing the entire bathroom/ shower.
This is the update for now. I will try to get some photos soon.
tinyrevolution.us/http://tinyrevolution.us/2012/10/05/special-radiant-barrier-and-insulation-offer-from-ecofoil/
Labels:
400 square foot house,
bathroom,
building,
cabin,
construction,
decking,
flooring
Friday, September 28, 2012
update
This past week I have been sick. We have done little work and thus the lack of posts. Sorry for the unexplained stop in posting flow. I am starting to feel much better and plan to have a weekend full of house work.
Though I have been sick we have done a little work on the house. We have almost finished laying the maple flooring on the second floor. This has been a chore considering that our generator is on its last leg. It was bought used two years ago. Apparently it had lived a full life before me and I made sure to provide it with plenty of heavy lifting to finish it off. I can get it to run for up to two minutes at a time which allows us to fill the air compressor, nail a few tongue and groove planks with the stapler, and then run back down the ladder to adjust the carburetor/ begin the process again. Needless to say it has been an endeavor. Today I plan for us to finish the flooring and frame in a door as well as a window.
Though I have been sick we have done a little work on the house. We have almost finished laying the maple flooring on the second floor. This has been a chore considering that our generator is on its last leg. It was bought used two years ago. Apparently it had lived a full life before me and I made sure to provide it with plenty of heavy lifting to finish it off. I can get it to run for up to two minutes at a time which allows us to fill the air compressor, nail a few tongue and groove planks with the stapler, and then run back down the ladder to adjust the carburetor/ begin the process again. Needless to say it has been an endeavor. Today I plan for us to finish the flooring and frame in a door as well as a window.