Monday, September 3, 2012

Second floor

       This past week has proved to be productive. Partly due to the threat of impending rain and partly because we made a conscious effort to build on multiple days. Unfortunately, I forgot to bring the camera for a daily snap shot. The photo to the left is our progress as of the end of the week.  The sub floor is done, save a small strip that will allow access to the crawl space. The second floor has half of the studs done. Yes, we are building the second floor with traditional framing as opposed to timber framing. Building the timber ribs was fun and interesting but there is no way we can safely raise ribs on a second floor. Not to mention we ran out of cured oak for the process. So, standard stud walls it is. We are using saw mill cut pine from the mill five miles away. 2x4x8s are 2.40 a board and that beats Lowes by a mile, not to mention it is locally sourced, cut and milled. Additionally, the wood from the mill is true cut as opposed to the "standard" lumber from the store that is labeled 2x4 but is really smaller.
      We were able to build a jig and finish half of our roof trusses this week. We lifted them into place with a reasonable amount of grunting and ladder climbing. The metal roofing and reflective bubble insulation was picked up this week and we will hopefully install it in the next couple days.
     Yesterday, amidst the rain, we burned four large piles of brush. Most of the brush was from clearing the site for the house. We also burned a large amount of brush from our recent clearing in the forest surrounding the house. The burning really helped to clean up the surrounding area and removing the downed brush from the forest will make room for our hazelnut planting this Fall.
    Below are several more pictures of the house in its current state, taken from different angles. The second to bottom photo is taken from the lower field and gives good perspective on how the house sits up on the hill.




No comments:

Post a Comment